| 1. | Pile group effect of main pylon foundation of sutong bridge 苏通大桥主塔墩基础群桩效应研究 |
| 2. | Accuracy analysis about pier shaft construction survey of sutong bridge 关于苏通大桥墩身施工测量的精度分析 |
| 3. | Analysis of sutong bridge ' s influence on nantong city ' s economy social development 苏通大桥对南通经济社会发展的影响分析 |
| 4. | Analysis of anti - washing construction of fourth main tower pier of great sutong bridge 苏通大桥4号主塔墩基础防冲刷施工难点分析 |
| 5. | With the construction of sutong bridge projected to be completed by 2008 , nantong is ever becoming an important player in the yangtze delta economic circle , centered by shanghai 2008年苏通长江大桥建成后,南通将成为以上海为中心的长三角经济区的更重要的一员。 |
| 6. | Based on the construction practice of steel cofferdam for pier base of main pier no . 6 close to the pylon of sutong bridge , the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described 摘要以苏通大桥近塔墩主6号承台钢围堰工程实践为基础,介绍该桥深水双壁钢围堰设计、施工的关键技术。 |
| 7. | During the construction of sutong bridge , relevant parameters were identified in time through monitoring , data acquisition and analyses , and effective measures for parameter modification were proposed , thus ensuring the construction of the bridge with high quality and at high speed 文章阐述了苏通大桥施工中通过监测,数据采集,分析计算,及时识别有关参数并提出有效的调整措施,保证了大桥高质量、高速度施工。 |
| 8. | Combined with the introduction to the condition assessment system on runyang bridge which is the longest suspension bridge in china and sutong bridge which is the longest cable - stayed bridge in the world , the function and its constitution of this system are discussed in detail 结合润扬大桥悬索桥(国内最大跨度的悬索桥)及苏通大桥(世界在建最大跨度的斜拉桥)中的状态评估系统,介绍了该系统的功能以及模组构成。 |
| 9. | According to features of diffcult anti - washing construction of pier foundation under compley hydroraphic , gological , and water potential conditions , combining construction condition methods , author analyze and conclude key points and difficulties of anti - washing construction of the fourth main pier of great sutong bridge , and difficulties in construction and relevant countermeasures 摘要针对在复杂的水文、地质、河势条件下进行桥墩基础冲刷防护施工难度大的特点,结合施工工艺和方法,对苏通大桥主桥4号主塔墩冲刷防护施工中的重点难点、施工中出现的不利隋况及应对措施进行了分析研究。 |
| 10. | Taking the south approach of the sutong bridge as example , the interaction of the adjacent spans in the longitudinal and lateral direction is discussed in this paper , comparing the results according to specifications of earthquake resistant design for highway engineering with the results from fem analysis 摘要本文以苏通大桥南引桥为例,按照现行《公路工程抗震设计规范》提供的相关计算公式与有限元的计算结果进行比较分析,探讨了梁桥纵横向相邻桥跨之间的耦联作用。 |